Refresh Current state: first full /design round-trip done (ten31-database)
This commit is contained in:
@@ -101,8 +101,12 @@ should carry this so any vendor's agent surfaces pending items at session start:
|
||||
issuance under keysat's `merchant-onboard` key) is **unblocked** — build the harness + first run
|
||||
in a keysat session. Stage 2 (Path 2, buyer-pays on regtest) is **gated** on keysat's
|
||||
`payment_providers:write` scope + network gate + sandbox flag.
|
||||
- **Design system live (item 8).** recap Case B (Extract) backfill done (app 0.2.161). **Open
|
||||
(decoupled):** a fresh Claude Design run to confirm export internals + tune Phase-C.
|
||||
- **Design system live; first full live round-trip done (item 8).** recap Case B (Extract)
|
||||
backfill (app 0.2.161); **ten31-database** was the first end-to-end run — Case-B extract →
|
||||
mobile-first `BRIEF.md` → Claude Design cloud round-trip → Phase C distilled + Phase D field
|
||||
notes promoted to `guides/design.md` (`176eebe`). The "confirm export internals + tune Phase-C"
|
||||
open item is **closed**. Residual is per-project execution (ten31-database mobile build, being
|
||||
scoped in that repo — not standards work).
|
||||
- **Next steps:** (1) first real `/adjudicate` run on keysat/recap to calibrate the drop-bias
|
||||
(item 10); (2) Stage-1 `onboarding-tester` harness in a keysat session (item 9); (3) cross-repo
|
||||
quality-gate standard + `/harden` (item 1); (4) non-git-folder sweep under `~/Projects` (item 6
|
||||
|
||||
Reference in New Issue
Block a user