Commit Graph

3 Commits

Author SHA1 Message Date
Keysat bb27e4c32a Add /design round-trip and design-checker agent to the fleet
Design/branding for any user-facing repo becomes a vendor-neutral on-disk
contract — design/DESIGN.md (nine-section brief) + design/tokens.tokens.json
(W3C DTCG tokens) — that every agent reads before building UI. Claude Design
is the interchangeable cloud front-end, never a dependency.

- /design (main-thread command): inspiration-first scoping -> BRIEF.md -> user
  drives the cloud step -> distill the export back into the contract. Phase-C
  token distillation is agent-mediated because the export is inline-hardcoded
  HTML/CSS, not DTCG.
- design-checker (read-only subagent): audits a repo's UI against its own
  committed contract; says "run /design first" when none exists.
- /new-project scaffolds design/ for user-facing projects.
2026-06-16 09:04:46 -05:00
Keysat 908d96a6e5 Fold idea-workshop into /new-project; add placement reference
Harvest the retired idea-workshop skill into the current new-project flow:
- form-factor gate (is this even a standalone repo, or a feature/skill/agent
  of something that exists? bail + reroute if so)
- worth-building gate at sign-off (build effort + ongoing tax -> BUILD/PARK/ADOPT)
- placement step that walks the new guides/placement.md
- falsifiable-exit substance rule and a posture section
- architectural decisions land in the new repo's AGENTS.md ## Decisions section,
  absorbing the old DECISIONS.md function (no separate ADR file)

Add guides/placement.md (ported from the skill) and point how-i-work.md at it.
Its infra facts are UNVERIFIED (one-shot from chat history) and flagged for a
review pass with me (ROADMAP item 7).
2026-06-14 19:39:00 -05:00
Keysat 8548afd9fd Add /new-project bootstrap command (guide + wrapper)
The inverse of /retrofit: workshops a captured (new) inbox idea into a repo that is standards-compliant from line one (AGENTS.md + CLAUDE.md symlink, ROADMAP, canonical deny-by-default .gitignore, .claude wiring, inbox-check line), publishes via a manual Gitea-create gate, and clears the (new) inbox item. Resolves ROADMAP item 5 open questions (manual Gitea gate; stack quality gate deferred to /harden; workshop seeds Current state) and marks it BUILT.
2026-06-14 12:44:55 -05:00