Commit Graph

2 Commits

Author SHA1 Message Date
Keysat 908d96a6e5 Fold idea-workshop into /new-project; add placement reference
Harvest the retired idea-workshop skill into the current new-project flow:
- form-factor gate (is this even a standalone repo, or a feature/skill/agent
  of something that exists? bail + reroute if so)
- worth-building gate at sign-off (build effort + ongoing tax -> BUILD/PARK/ADOPT)
- placement step that walks the new guides/placement.md
- falsifiable-exit substance rule and a posture section
- architectural decisions land in the new repo's AGENTS.md ## Decisions section,
  absorbing the old DECISIONS.md function (no separate ADR file)

Add guides/placement.md (ported from the skill) and point how-i-work.md at it.
Its infra facts are UNVERIFIED (one-shot from chat history) and flagged for a
review pass with me (ROADMAP item 7).
2026-06-14 19:39:00 -05:00
Keysat 8548afd9fd Add /new-project bootstrap command (guide + wrapper)
The inverse of /retrofit: workshops a captured (new) inbox idea into a repo that is standards-compliant from line one (AGENTS.md + CLAUDE.md symlink, ROADMAP, canonical deny-by-default .gitignore, .claude wiring, inbox-check line), publishes via a manual Gitea-create gate, and clears the (new) inbox item. Resolves ROADMAP item 5 open questions (manual Gitea gate; stack quality gate deferred to /harden; workshop seeds Current state) and marks it BUILT.
2026-06-14 12:44:55 -05:00