Mark v0.1.0:77 deployed & verified live (digest Phase B)
installed-version on the box -> 0.1.0:77; migration chain ran through 76->77; server up on :8080 with the digest scheduler running (policy-controlled, auto-send off by default). Docs-only.
This commit is contained in:
+1
-1
@@ -87,7 +87,7 @@
|
||||
## Backlog (post-Phase-1 agentic)
|
||||
|
||||
### Daily activity digest (email to the team)
|
||||
*Requested 2026-06-15. **Phase A deployed** (v0.1.0:76, live on the box). **Phase B built 2026-06-15** (digest content + Spark summarization + daily scheduler + on-demand send) — in the repo, awaiting the next build/deploy.*
|
||||
*Requested 2026-06-15. **Phase A deployed** (v0.1.0:76). **Phase B deployed & verified live in v0.1.0:77 (2026-06-16)** — digest content + Spark summarization + daily scheduler + by-investor section + admin-panel control + on-demand send. Auto-send defaults OFF until an admin enables it in Settings → Admin.*
|
||||
|
||||
**Decisions (locked 2026-06-15):** recipients = **all active admins**; summarization = **Spark-LLM narrative** (never Claude — un-anonymized substance stays local); granularity = **grouped by user** (→ per investor).
|
||||
|
||||
|
||||
Reference in New Issue
Block a user