Files
ten31-database/frontend
Keysat ee9db6425a Mobile Phases 4–5: Pipeline (swipe-between-stages) + Reminders
Completes the four mobile-first surfaces. Both phases follow the established
useIsMobile() wrapper → Mobile*/Desktop* pattern; desktop is untouched (only
renamed Desktop*). No backend change.

P4 Pipeline (MobilePipeline): CSS scroll-snap swipe between the four stages +
count-forward segmented control + page dots; per-card ‹/› stage move and
tap → full-screen opp detail with a stage-picker sheet. Opp-centric — shares
PATCH /api/opportunities/{id}/stage with the desktop board and the Grid's
stage edit; view + advance-stage only (removal stays on the Grid/desktop board).

P5 Reminders (MobileReminders): urgency-grouped list over /api/reminders
(Overdue/Due soon/Later/Done/Cancelled) with an Active/Done/All filter; each
row is a pointer-drag swipe (left = mark done, right = snooze +7d, keeping
status open and pushing due_date, per the desktop rationale); tap → create/edit
BottomSheet (investor is create-only, matching the backend PATCH field set).
formatDueShort/reminderDueDelta fix the desktop formatter mis-rendering future
due dates.

Verified: render-smoke + throwaway jsdom 375px interaction harnesses (12/12
each); reviewer passes applied — notably P5 pointercancel no longer fires a
spurious mark-done. Deploy-pending (no s9pk built); not yet tested on a phone.
2026-06-19 15:44:49 -05:00
..