28 lines
1.6 KiB
Markdown
28 lines
1.6 KiB
Markdown
# gitea-review-bot — ROADMAP
|
|
|
|
Phases beyond the first milestone (threaded single-flow review + merge/reject/deploy; see AGENTS.md
|
|
`## Current state`).
|
|
|
|
## Phase 2 — Subagent panel, proven
|
|
- The lead `claude -p` reliably spawns the enabled subagents (reviewer / adjudicator /
|
|
security-auditor) and presents each opinion + its own recommendation. **Exit:** a real PR review
|
|
shows up to 3 distinct, labeled opinions + the lead's call; flaky headless subagent spawning
|
|
falsifies it → fall back to bot-orchestrated separate `claude -p` runs (the rejected alternative).
|
|
- In-chat `agents +/-` toggles change which subagents run on the next review, per room (persisted).
|
|
|
|
## Phase 3 — Multi-repo at scale
|
|
- Onboard ≥3 repos to their own rooms; confirm independent polling, no cross-talk. **Exit:** three
|
|
repos reviewed from three rooms in one run with no interleaving.
|
|
- Per-repo deploy (`[repo.<name>].deploy_on_merge`) exercised on a non-static repo (not a Pages site).
|
|
|
|
## Phase 4 — Spark Control tile
|
|
- Status badge + Update/Restart/Stop-Start/Logs, mirroring matrix-bridge's D10 (captured in the
|
|
cross-project inbox as a spark-control item).
|
|
|
|
## Deferred / non-goals
|
|
- Not a Claude-session bot (that's matrix-bridge); not Maubot (revisit at ~6+ bots or web-UI mgmt);
|
|
no GitHub/non-Gitea; no Gitea account/permission management; E2EE deferred (private LAN transport).
|
|
- A shared "bot kit" library (extract the common matrix-nio + SSH plumbing across the three bots)
|
|
once duplication bites — the lighter step before ever considering Maubot.
|
|
- Poll → webhook upgrade if 60s latency ever matters.
|