8548afd9fd
The inverse of /retrofit: workshops a captured (new) inbox idea into a repo that is standards-compliant from line one (AGENTS.md + CLAUDE.md symlink, ROADMAP, canonical deny-by-default .gitignore, .claude wiring, inbox-check line), publishes via a manual Gitea-create gate, and clears the (new) inbox item. Resolves ROADMAP item 5 open questions (manual Gitea gate; stack quality gate deferred to /harden; workshop seeds Current state) and marks it BUILT.
23 lines
1.2 KiB
Markdown
23 lines
1.2 KiB
Markdown
---
|
|
description: New-project bootstrap — workshop a captured idea into a standards-compliant repo (AGENTS.md + symlink, ROADMAP, canonical .gitignore, .claude wiring) and publish it to Gitea
|
|
argument-hint: [optional: working name or the idea, e.g. "new:relay" or a one-line pitch]
|
|
allowed-tools: Bash, Read, Edit, Write, Grep, Glob, Agent
|
|
---
|
|
|
|
Bootstrap a brand-new project under `~/Projects`, standards-compliant from line one.
|
|
Optional seed from me (may be empty): $ARGUMENTS
|
|
|
|
Your complete orchestration guide — locating the inbox seed, the scope workshop, the
|
|
sign-off gate, the scaffold layout, the Gitea publish step, and the final report — is at:
|
|
|
|
~/Projects/standards/guides/new-project.md
|
|
|
|
Read it in full first, then follow it exactly. If you cannot read that file, stop and
|
|
report precisely that — do not improvise the bootstrap.
|
|
|
|
This runs in the main thread on purpose: scoping a new project is a conversation. Ask me
|
|
the judgment calls (the objective and non-goals, the stack, the architectural forks, the
|
|
scaffolding-plan sign-off, and the Gitea publish) and wait — nothing lands on disk before
|
|
Phase 3, and nothing is created without my sign-off in Phase 2. My remote is self-hosted
|
|
Gitea, never GitHub.
|